Joule Work Desktop with Conversations, the composer, and the available work sources.

Testing Joule Work Desktop with Microsoft 365, Local Files, and SAP

You have probably seen Joule Work Desktop on LinkedIn by now. Sebastian Steinhaeuser showed how it prepares him for a customer meeting. Philipp Herzig called it the new SAP GUI, with a smile, and demonstrated a workflow across email, a spreadsheet, a Space, and PowerPoint. Joule Work Desktop is now available to SAP employees after a test with more than 6,000 colleagues. Selected customers can also use it through the Early Adopter Care program on macOS and Windows. ...

August 12, 2026 · 9 min · 1778 words · Marian Zeis
ARC-1 version 1.0 release cover showing the enterprise-ready open-source ADT MCP connected to ECC, S/4HANA, BTP ABAP Environment, and S/4HANA Cloud Public Edition.

ARC-1 1.0: One Deployment, Multiple SAP Systems

ARC-1 1.0 is here. When I published the first ARC-1 post, I explained why I built an MCP server for ABAP development and why security has to be part of it from the beginning. This post is not another deep dive into every tool. The release notes already do that. For version 1.0 I want to focus on what really changed: ARC-1 became more stable, it can serve multiple SAP systems from one BTP deployment, the BTP and security setup is much better documented, and the project is no longer only one repository. ...

August 3, 2026 · 12 min · 2428 words · Marian Zeis
ARC-1 on SAP BTP Cloud Foundry architecture with VS Code, XSUAA, Destination Service, Connectivity Service, Cloud Connector, and an on-premise SAP ABAP system.

Creating an ARC-1 BTP Diagram with Codex and a draw.io Skill

I wanted one practical thing: an editable draw.io diagram for ARC-1 on SAP BTP that looks like it belongs in the SAP Architecture Center. My first attempts with generic diagram prompts were not really useful. They often had dark backgrounds, icons that were too large, and arrows running through boxes. I wanted something closer to the SAP examples: a white canvas, the right BTP areas and service icons, understandable flows, and an editable draw.io file that I could still correct by hand. ...

July 9, 2026 · 9 min · 1901 words · Marian Zeis